Max-Amine solutions delivered an ROI of greater than 400% for a petrochemical plant in Southern Europe

Fill out the form below and download the full case study to learn how you can achieve long-term performance for your amine unit. 

total-amine-solution-brochure 3

In this case study

A major petrochemical facility in Southern Europe was struggling with recurring shutdowns, severe fouling, corrosion, and ineffective CO₂ removal in its amine unit. To address these challenges, Veolia delivered a tailored, science-based solution. 
By implementing our Total Amine Solutions strategy – including custom-formulated amine blends, advanced chemicals and additives, and best practice guidance – the plant not only overcame operational setbacks but also extended the unit’s run time.


Results: 

  • Over 400% return on investment
  • Extension of unit run time and elimination of unscheduled downtime
  • Significant reduction in corrosion and fouling
  • Maximized CO₂ removal efficiency
  • Lower operating and maintenance costs.

 

------------------------------------


Find out more about Total Amine Solutions for amine units.
 

Would you like to learn more about solutions that can optimize the performance of amine units in your refinery?